Film one length from the deck. SwimAI tracks your body frame by frame, measures your stroke, names the one fault costing you speed, and writes your training week around fixing it.
Prop your phone on the deck and swim past it. Any pool, any phone. No wearable, no markers.
17 body points tracked on every frame. Your level, stroke rate, stroke count, speed, distance per stroke, and the faults that matter.
Kai, your coach, builds your sessions around that fix: warm-up, drill, main set, cool-down, with the why and the cue for each.
Analysis, your week, Kai, progress and Apple Watch: the screens from the App Store listing.
Frame-by-frame body tracking, stroke timing for each arm, level, speed and the fault to fix first.
Weekly sessions built from your film, your level, your goal and your gear. Miss a week and it adapts.
Ask anything. Kai has seen your swims and your plan, and answers like a coach on deck.
Sessions on your wrist: reps advance on wall touches, with live heart-rate zones, rest timers and pace.
Download SwimAI, film one length, and see what a coach would see. The first month is free.